单项选择题
A、Install a p615 per application.
B、Install a p650 with AIX 5.2 and dynamic LPAR and CUoD.
C、Install the appropriate solution once the requirements are understood.
D、Install a POWER5 system with AIX 5.3, Advanced POWER Virtualization, and CoD.