单项选择题
A.save network cost B.improve the reliability of supplying power to important load C.prevent sequence reverse D.increase the power factor of important load
()is not installed on the main switchboard.A.Ammeter an...
单项选择题()is not installed on the main switchboard.
A.Ammeter and changeover switch B.Power factor meter C.Synchroscope D.Reverse sequence relay
()is used to control, modulate, monitor and protect gen...
单项选择题()is used to control, modulate, monitor and protect generator set.
A.Control panel B.Load panel C.Paralleling panel D.Busbar
()is not a part of the main switchboard.A.BusbarB.Load ...
单项选择题()is not a part of the main switchboard.
A.Busbar B.Load panel of main generator C.Paralleling panel D.Shore connection box