单项选择题
A system administrator is deploying a new POWER5 server. The application requires AIX 5L V5.2. Which of the following virtualization technologies can be used?()
A.DLPAR B.Micro-Partitioning C.Virtual Storage D.Virtual Ethernet
WhichofthefollowingshouldbedoneFIRSTwhensettingupanewp5...
单项选择题Which of the following should be done FIRST when setting up a new p5-520 to be managed by a new HMC via a private network?()
A.Change passwords in ASMI B.Add the managed system to the HMC C.Connect the p5-520 to a power source D.Connect the HMC and the p5-520 server’s HMC1 port to the same network
Company.com would like to share CPU resources between A...
Company.com would like to share CPU resources between AIX V5.3 and Linux partitions. Which solution would best satisfy this customer requirement?()
A.Micro-Partitioning B.Partition Load Manager C.eWLM D.Grid Toolbox
AfterrebuildingthelistofvirtualdevicesusedbytheVIOserve...
单项选择题After rebuilding the list of virtual devices used by the VIO server using the "cfgdev" command, which command would be run to verify that a newly configured virtual SCSI adapter is available?()
A.lsdev -virtual B.lsdev -Cs scsi C.lscfg -vl D.lsdev -adapter