单项选择题
A.sealing clamps B.repair tape C.a tube patch D.sail twine and vulcanizing kit
Point out which one of the following items is not in th...
单项选择题Point out which one of the following items is not in the charge of Chief Officer in repairing operation().
A.hull cleaning B.derusting and painting C.the maintenance of boiler D.docking and undocking
Please have the damage to the gangway().A.repairB.to re...
单项选择题Please have the damage to the gangway().
A.repair B.to repair C.repairing D.repaired
Please have the damage on gangway()as soon as possible ...
单项选择题Please have the damage on gangway()as soon as possible for account of the Stevedore Company.
A.repaired B.repair C.repairing D.repairs