单项选择题
A.ability of the anchors to hold in a seabed B.anchor chain catenary length C.variability of the fairlead D.angle of the flukes
The lockmaster has given you permission to tie off on t...
单项选择题The lockmaster has given you permission to tie off on the lower guide wall to wait your turn to lock through. What should you be most concerned with? ()
A.A downbound vessel B.An upbound vessel C.Current reaction when the lock chamber is being emptied D.Current reaction when the lock chamber is being filled
The length of chain between the anchor and the end of t...
单项选择题The length of chain between the anchor and the end of the pendant line is called the().
A.pigtail chain B.thrash chain C.crown chain D.wear chain
The holding power of an anchor at a given scope of cabl...
单项选择题The holding power of an anchor at a given scope of cable increases when the().
A.amount of chain lying along the bottom increases B.length of the catenary is reduced C.mooring line tension is increased D.amount of chain lying along the bottom decreases