单项选择题
A.it is difficult for them to finish the job in time B.difficult for them to finish the job in time C.they have much difficulty to finish the job in time D.that difficult for them to finish the job in time
During port state control inspection, if one generator ...
单项选择题During port state control inspection, if one generator is out of commission, ()should investigate whether power is available and conduct tests.
A.the third engineer B.the PSCO C.the surveyor D.the chief engineer
During inspection of the machinery space, which of the ...
单项选择题During inspection of the machinery space, which of the following statements points to an unsatisfactory organization of the systematic maintenance?()
A.missing valve hand wheels B.dirty tank tops C.a large number of temporary repairs D.All of the above
When the PSCO would like to witness a fire drill carrie...
单项选择题When the PSCO would like to witness a fire drill carried out by the crew, he should consult ()to locate a simulated fire.
A.the manager of the company B.the surveyor of the Classification Society C.the master of the vessel D.the chief engineer of the vessel