单项选择题
A.proceeding B.overloading C.collision D.flooding
Oil Record Book Part I shall be provided to ().A.every ...
单项选择题Oil Record Book Part I shall be provided to ().
A.every oil tanker B.every ship of 400 tons gross tonnage and above C.A and B D.Neither A nor B
Which of the following should be recorded in Oil Record...
单项选择题Which of the following should be recorded in Oil Record Book Part I (machinery space operation) ?()
A.Non automatic discharge overboard of machinery space bilge water B.Automatic discharge overboard of machinery space bilge water C.A and B D.Neither A nor B
A ruptured diaphragm in a thermostatic expansion valve ...
单项选择题A ruptured diaphragm in a thermostatic expansion valve will cause the valve to ().
A.open B.close C.remain in its position D.flood the evaporator with refrigerant