单项选择题
A.the engineers,from a panel in the engine room B.shutting off the current to the winch C.pushing the switch lever arm while the winch is running D.All of the above
In securing a towing cable,consideration must be given ...
单项选择题In securing a towing cable,consideration must be given to letting go in an emergency. The possible whip of towlines when released can be overcome by().
A.increasing the shaft RPM prior to release B.using a pelican hook for quick release C.using preventers D.using a short chain for the lead through the stern chock
In moderate wind and current what should be the length ...
单项选择题In moderate wind and current what should be the length of chain with a single anchor?()
A.5 times the depth of the water in good holding ground B.10 times the depth of the water in shallow water C.2 times the depth of the water in poor holding ground D.8 times the depth of the water in deep water
If kinking results while wire rope is being coiled cloc...
单项选择题If kinking results while wire rope is being coiled clockwise,you should().
A.coil it counterclockwise B.not coil it C.take a turn under D.twist out the kinks under a strain