单项选择题
A.well ventilated B.well clean C.in good order D.more room
Bridge orders must be () and a record of any required c...
单项选择题Bridge orders must be () and a record of any required changes in speed and direction should be kept.
A.slowly carried away B.carried out with a period of delay C.promptly carried out D.paid by the captain
When under maneouvring conditions with the machinery be...
单项选择题When under maneouvring conditions with the machinery being manually operated the control unit or console should be ()
A.automatically controlled B.continuously manned C.off power D.none of the above is true
At the beginning of the watch the current operational p...
单项选择题At the beginning of the watch the current operational parameters and the condition of all machinery should be verified and also the log readings should correspond with those ().
A.noted by the bridge officer B.told by last duty engineer C.observed D.in the instruction manual