单项选择题
A.only when the cargo is within its rail B.during the time when loading or ynloading is going on C.after the cargo is checked by tallymen D.as soon as loading or discharging begins
The stowage factor should be calculated().A.before the ...
单项选择题The stowage factor should be calculated().
A.before the stowage plan is made B.when the stowage plan is made C.after the stowage plan is made D.before loading
The tallying of cargo refers to such kind of work that ...
单项选择题The tallying of cargo refers to such kind of work that the amount and condition of all cargo should be checked().
A.after its arrival at the destination B.during the ship's voyage at sea C.before they come to the dock D.during the time when the loading or diacharging is going on
The tentative cargo plan().A.eliminates confusion with ...
单项选择题The tentative cargo plan().
A.eliminates confusion with the final stowage plan B.shows the approximate amount of cargo to be loaded in each hold C.expedites the total operation D.requires an unproportional number of gang hours of work to discharge the cargo