单项选择题
A.running rigging leading aft from the masts B.running rigging leading forward from the masts C.standing rigging leading aft from the masts D.standing rigging from the cross trees to the mast head
All the damage and shortage,()those incurred after disc...
单项选择题All the damage and shortage,()those incurred after discharge and before delivery to receivers,should be noted in the discharging report.
A.including B.besides C.except D.in addition to
A sling is a device used in().A.hoisting cargo aboard a...
单项选择题A sling is a device used in().
A.hoisting cargo aboard a vessel B.hoisting personnel aboard a vessel C.securing a small boat to a large vessel D.hoisting the anchor
A large basin cut into the shore,closed off by a caisso...
单项选择题A large basin cut into the shore,closed off by a caisson,and used for drydocking of ships is known as a().
A.slipway B.graving dock C.ground warp D.caisson dock