单项选择题
A.contract B.party C.person D.company
Compliance with the terms of the load line certificate ...
单项选择题Compliance with the terms of the load line certificate on a vessel is the responsibility of the().
A.Ballast Control Operator B.Barge Supervisor C.Master or Offshore Installation Manager D.operators representative
Cargo damaged due to water being present in a cargo hol...
Cargo damaged due to water being present in a cargo hold,as a result of a leak in the hull plating,is said to be damage by(). ① Free moisture ② Transfer of hygroscopic moisture
A.① only B.② only C.Both ① and ② D.Neither ① nor ②
Any partial loss or damage shall be()pro rata on the ba...
单项选择题Any partial loss or damage shall be()pro rata on the basis of such declared value.
A.adjusted B.arranged C.determined D.fixed