单项选择题
A.cargo runners B.mooring wires C.shrouds D.stays
During a storm,the chance of fatigue failure of a moori...
单项选择题During a storm,the chance of fatigue failure of a mooring line will increase as().
A.vessel motions increase B.mooring tensions decrease C.KG increases D.KG decreases
Consideration should be given in planning for the moori...
单项选择题Consideration should be given in planning for the mooring orientation in a new location so that in adverse weather a crane is available to off-load the supply vessel on what side of the unit?().
A.Weather side B.Leeward side C.Upwind side D.Crosswind side
Chafing gear should be placed().A.at all wearing points...
单项选择题Chafing gear should be placed().
A.at all wearing points of mooring lines B.at the bitter ends of all standing rigging C.around running rigging D.on wire rope only