单项选择题
A.fire fighting pump B.the steering gear C.life boat engine D.the main engine
Prior to a ship’s departure from any port () should be ...
单项选择题Prior to a ship’s departure from any port () should be tested with deck officer to ensure satisfactory operation.
The()is a series of trials done at sea to determine whe...
单项选择题The()is a series of trials done at sea to determine whether the ship has met the specifications of design, modification, or repair.
A.Sea trial B.Bed-test C.Engine performance D.PSC inspection
When is dock survey carried out?()A.During annual repai...
单项选择题When is dock survey carried out?()
A.During annual repair B.Usually during dock repair C.Before sea trial D.After 5 years from last annual survey