单项选择题
The fuel booster pump and steam to fuel heater, together with fuel pipe heater tracer line should be shut off as soon as the () order is acknowledged.
A.finished with engines
B.stop
C.stand by
D.full ahead
点击查看答案&解析
相关考题
